Worldwide[change]
Home > Case

"Chinese Taishan" cruise IT project

       "Chinese Taishan" is the frist cruise self managed by China with a length of 180.45 meter, a width of 25.5 meter, a gross tonnage of 2.45 million. Our company has undertaken "Chinese Taishan" cruise system integration and we are the escort of this first luxurious cruise in China.


"Chinese Taishan" system integration project include

- GC

Engineering Project Supervisor

- CCTV system

- Wireless coverage system

- Wi-Fi phone system

- Satellite access system

- Network security system

- Software development

 

"Chinese Taishan" project hardware and software

- Hotel management system

- Boarding system,far end wireless access

- Wi-Fi phone

- CCTV

- Data backup 

- SW,server,laptop,firewall and so on 

 

The Advantages of Steamship Intelligent Project

-Familiar with the design and implementation of the steamship weak current and intelligent system, Bisheng Group has lots of experience on the implementation of the steamship weak current and intelligent engineering;

-Familiar with the steamship construction requirements ,and the characters and requirements of the steamship projects.

-Familiar with related certification requirements of classification society; can select materials and devices according to the classification society requirements;Keeping good cooperation with the material manufacturers; carrying on the construction in strict accordance with the requirements of the classification society.

 


previous: Next: Ocean Grand IT project

© 2014 - 2015 BiShengCMS. ALL RIGHTS RESERVED.   Powered by bishenggroup.com Version 1.0.0